<span id="1tzr9"><dl id="1tzr9"><del id="1tzr9"></del></dl></span>
<span id="1tzr9"></span>
<strike id="1tzr9"></strike>
<strike id="1tzr9"><dl id="1tzr9"><del id="1tzr9"></del></dl></strike><span id="1tzr9"></span>
<strike id="1tzr9"><i id="1tzr9"></i></strike><span id="1tzr9"><i id="1tzr9"></i></span>
<strike id="1tzr9"><dl id="1tzr9"><cite id="1tzr9"></cite></dl></strike>
<strike id="1tzr9"></strike>
<strike id="1tzr9"></strike>
<strike id="1tzr9"><i id="1tzr9"><cite id="1tzr9"></cite></i></strike>
<span id="1tzr9"></span>
<span id="1tzr9"><dl id="1tzr9"><ruby id="1tzr9"></ruby></dl></span>
<ruby id="1tzr9"></ruby><span id="1tzr9"><dl id="1tzr9"><ruby id="1tzr9"></ruby></dl></span><strike id="1tzr9"><dl id="1tzr9"><del id="1tzr9"></del></dl></strike><strike id="1tzr9"></strike><strike id="1tzr9"><i id="1tzr9"><del id="1tzr9"></del></i></strike>
<strike id="1tzr9"></strike>
<span id="1tzr9"><video id="1tzr9"><ruby id="1tzr9"></ruby></video></span>

What inspection should be done before the roller fruit selec

Time:2021-04-07 13:38  Browse:277


 
Instructions for Jingjiang Weineng machinery:
 
1. Check the pipeline system for air and water leakage. If so, inform the repair personnel to repair.
 
2. Check if the cleaning solution is satisfactory. If not, add the cleaning solution in time.
 
3. First jog test run, and then empty work for 2-3 minutes, check the transmission system (motor, coupling, reducer) and the movement of the conveyor belt is stable, and admit that everything is normal before production.
 
4. Open the floating oil cleaning equipment (without floating oil cleaning equipment outside) to start floating oil cleaning. Therefore, when the water pump is still on, the water surface is quiet, and the oil drainage effect is good. After the floating oil is completely cleaned, the oil is removed intermittently, and the oil is discharged at noon break.


太小太嫩了好紧在线观看